Agenda. General scope of the review: Evaluate the preliminary design against design requirements (specified, e.g., in the System Requirements Document and the Design Criteria Documents). Evaluate interface definitions. Evaluate high level schedule. Comment on design decisions, the design process, and the design approach. Start at 8:30 Los Alamos time. Welcome and charge to the committee (Plum) 15 min. WS requirements, physics and interfaces for linac (Plum) (ppt) 25 min. WS requirements and interfaces for ring, RTBT (Cameron) 15 min. Laser wire (Connolly). Experimental status, radiation resistance, cost, and schedule. (ppt) 30 min. Wire heating (CJ Liaw) (ppt) 15 min. HEBT, ring, RTBT actuators (Jim Cullen) 30 min. Ring, RTBT electronics (Al DellaPenna) 40 min. Linac actuators (Ross Meyer) 40 min. MEBT, linac, HEBT electronics (Chris Rose) 30 min. Committee deliberations Committee out brief Committee
|
|||||
|
|||||