11/26/01 et ----------- Added Reference document for naming Added PS names (from Jack Gioia, LANL) Added names of linac lattice elements 11/14/01 et ----------- Added CCL, SCL quad info; DTL steerer info Added CCL, SCL quad PS related info Updated DTL, CCL, SCL ideograms 8/08/01 jdg ------------ Added DTL PMQ magnet measurements 6/04/01 jdg ------------- Added new global coordinate table with all HEBT, Ring, and RTBT quad/dipoles. 5_23_01 jdg -------- Updated the global coordinate table. Tweaked quad between the DTL and CCL. 5/08/01 jdg ------------- Added the lattice twiss parameters 5/03/01 jdg ------------ Updated the Diagnostic Table 5/01/01 jdg ------------ Update the global coordinate table (reduced distances to linac and x-dumps) 4/18/01 jdg ------------- Removed old 840 MeV parameters, Added latest 1 GeV parameters Update cavities page. 4/02/01 jdg ------------ Updated the global coordinate table. 3/23/01 jdg ------------ New version of Global coordinates table. Also added Excel copy of it. 3/20/01 djg ------------ Updated global coordinate table to include 55 points. 3/8/2001 jdg ------------- Added the vacuum and expanded global coordinates tables. 2/13/01 jdg ----------- Added the linac beam size plots 10/30/00 jdg ------------- Updated the diagnostic requirements table and added the beam loss budget table 10/19/00 jdg ------------- Updated ring lattice file for latest working point. 10/2/00 jdg ------------- Changed "General Parameters" to "General Parameters and AP Requirements". Added the diagnostic requirements table to the "General Parameters and AP Requirements" page 9/25/00 jdg -------------- Added Superfish input files for the superconducting cavities to the lattice/input file section. 09/21/00 jdg -------------- Updated ring lattice (MAD 8). From J. Holmes. 09/19/00 jdg ------------ Updated parmila input file for the nominal end-to-end (MEBT -> HEBT ) 08/14/00 jdg ------------ Started drawings page. Cryo module and CCL/SCL interface so far. 07/24/00 jdg ------------ Updated parmila input file for the nominal end-to-end (RFQ -> SC ) 07/18/00 jdg -------------- Fixed SC cavity beta = 0.81 length and number 06/19/00 jdg -------------- Added end-to-end parmila input file. 06/11/00 jdg ------------- Updated SC cavity parameters. Added beta = 0.61 geometry Added MAD 9.5 input file for the Ring Fixed mad 8 input file for ring (added 1st part which was missing) 04/21/00 jdg -------------- Updated SC cavity table with results from 4/12-13/00 JLab meeting