Accelerator Physics Video Conference Minutes, 09/09/2003

 

Participants:

BNL: R. Connolly, A. Fedotov, D. Raparia, J. Wei

LANL: R. Hardekopf

LBNL: R. Keller, J. Staples

Jlab: R. Cothran

ORNL: S. Assadi, S. Danilov, J. Galambos, S. Henderson, J. Holmes, W. Klotz, L. Kravchuk, T. Pelaia, Y. Sato, A. Shishlo, E. Tanke

 

Agenda - 09/09

1) ASAC Preparations - S. Henderson

2) Ring IPM Design - R. Connolly

3) DTL1 Commissioning Results - E. Tanke

 

1) ASAC Preparations

--ASAC Preparations

 

2) Ring IPM Design

Collection of electrons via ExB drifts at the IPMs will require a magnetic field of 250 gauss. This can be supplied by permanent dipole magnets. With two permanent dipoles at each IPM, electrons could be collected, the beam could be steered by the 3-bump method, and trim windings could be avoided.

 

3) DTL1 Commissioning Results

--DTL1 Commissioning Results

 

 

 

The next video conference will held on Tuesday, September 16, at 4:00 EDT, 3:00 CDT, 2:00 MDT, 1:00 PDT.